Case Studies

Manchester City FC Training Ground
MWA Technology was tasked by the Premier League Football Club to ensure their training complex’s metering system was read on a Building management System.
Find the full case study in the download below:

Prince’s Gate Apartments
We were contracted to make vital repairs to the metering system, supplied by a competitor, at the most expensive apartments sold in London; one going for a cool £50 Million.
Find out more about this project by reading the full case study below:

Severn Trent Water at Stoke Bardolph
MWA was consulted to provide advice for the selection of RHI Energy Meter upgrades to the Severn Trent Water plant at Stoke Bardolph, Nottinghamshire.
Find the full case study in the download below:

Oxford University & Blavatnik Building
Working closely with Oxford University to provide all their metering services for their Earth Sciences Buildings, and the new award-winning Blavatnik Building, situated next to the Maths Institute.
Find out more about this project by reading the full case study in the download below:

Nottingham Council’s Electric Bus Project
Electrical installers EIC approached MWA Technology to supply electricity panel meters for EON’s Nottingham Council Electric Bus Project.
Find the full case study in the download below:

Bath University
Bath University was experiencing problems with their existing on-site metering. The inconsistency of meters installed lead to operational issues and low flow rates.
Find the full case study in the download below: